• Weekly Roundup – 06-Oct-24

    Class 33 ‘Crompton’ D6566 (33048) relocated from Minehead to Bishops Lydeard on Tuesday 1st October and took a rake of Empty Coaching Stock with her in readiness for the start of the red timetable later that day. Photo by Jo Ward © CC BY-NC 3.0

     

    On Sunday 6th October, the crew of Class 33 ‘Crompton’ D6566 (33048) reported that the No. 1 exhauster was arcing excessively, so volunteer loco manager Ian went along to check it out. After carrying out an inspection, Ian concluded that the exhauster motor needed a more detailed investigation so the loco completed the rest of her RED TIMETABLE diagram running on her No. 2 exhauster then ran ‘light engine’ to Williton where sister D6575 (33057) was ready and waiting to swap back into the role of ‘Duty Loco’. No doubt the offending exhauster will be quickly diagnosed and a repair carried out in the next week or two.

    Class 33 ‘Crompton’ D6566 (33048) returned to Williton on Sunday 6th October 2024 and took up a position on No. 1 road in front of Class 14 ‘Teddy Bear’ D9526. A very nicely mirrored photo by Tom Courtney © CC BY-NC 3.0

     

     

    DIESEL RUNNING DATES

    Keep an eye on our DIESEL RUNNING DATES page for details of the remaining diesel-hauled public services and sign up to our DIESELGEN email bulletin service to get advance notice of non-public service running. 

    Click here to join the DEPG

    Click here to go to our DIESEL RUNNING DATES page

    Click here to go to our ONLINE SHOP

    Click here to support D1010

    Thank you very much for your support !

     

     

    LOCO NEWS:

    Class 52 D1010 ‘WESTERN CAMPAIGNER’ – to reduce the amount of floor space being taken up by component parts now removed from the ‘B’ bogie, a number of second-hand stackable steel stillages were acquired and collected by Paul and Julie Tucker, with delivery to Williton taking place on Wednesday 2nd October. The stillages will stack up to four high but we will only be stacking them two high for storage inside the ‘D1010 container’.

    D1010 – a vanload of second-hand steel stillages have been acquired by the DEPG for the purpose of storing the many component parts that have been removed from D1010’s bogies. Pictured on 2nd October 2024 by Paul Tucker © CC BY-NC 3.0

     

    D1010 – Gordon continued his work on the ‘B’ bogie at Williton on Saturday 5th October 2024, with his attention being focused on the lubrication reservoirs for the axle box spring bearings. Photo by Andy Royal © CC BY-NC 3.0

     

    D1010 – the normally inaccessible lubrication reservoirs had become filled with oily dirt over the years, but had still performed their function in the case of 5 of the 6 axle boxes. Pictured at Williton on Saturday 5th October 2024 by Andy Royal © CC BY-NC 3.0

     

     

    Class 09 D4107 (09019) – this loco is based at Bishops Lydeard and is in regular use in support of WSR activities. She will move to Williton in early November to undergo body repairs and a repaint, along with some other maintenance activities that are aimed at keeping her reliable and available for service.

     

    Class 33 D6566 (33 048) – This loco has now returned to Williton to undergo repairs to her No. 1 exhauster motor.

     

    Class 33 D6575 (33 057) – this loco is now outstationed at Bishops Lydeard and has taken up the role of Duty Loco. Her next booked duties are under the RED TIMETABLE on Sunday 13th October.

     

    Class 35 ‘Hymek’ D7017 – this loco has had a great season, achieving 100% dispatch reliability and delivering consistent and excellent performances. She will remain at Minehead for a while so that she can be assessed for body repairs and repainting before eventually moving back to Williton for other repairs and winter maintenance.

     

    Class 35 ‘Hymek’ D7018 – a review meeting took place at Williton on Saturday 5th October to debate and develop Colin’s proposals for the static test rig that will be used to put the control block and control mechanisms through their paces in advance of returning the transmission to the loco. Suffice it to say that Colin’s work was up to it’s usual standard, so the work will proceed as planned !

    Details of the test rig and test plan will be covered in a future roundup.

    The review team were pictured while surrounded by Mekydro hardware at Williton on Saturday 5th October 2024. From left to right, Martin Howard, Colin Foxhall, Clive Burrows and Neil McCannon. Photo by Andy Royal © CC BY-NC 3.0

     

    Class 14 ‘Teddy Bear’ D9518 – the ‘Tuesday Team’ made further progress with the overhaul of the Paxman ‘Ventura’ 6YJXL engine and a parallel effort from Colin G and Andy P saw further progress on the cab and desk fittings. Some brand new bronze handles for the straight air brake valves were cast at Bridport Foundry to replace missing parts, the new parts being indiscernible from the old after several hours of ‘fettling’ work in the hands of Colin G.

    D9518 – the connecting rods of the left and right cylinders are different – the connecting rod of the right-hand piston rotates around that of the left-hand piston, which in turn rotates around the crankshaft. Pictured at Williton on Saturday 5th October 2024 by Andy Royal © CC BY-NC 3.0

     

    D9518 – the newly-manufactured brake handle on the left compares very nicely with the original but painted example on the right. The new handle was cast by Bridport Foundry. Pictured at Williton on Saturday 5th October 2024 by Colin Girle © CC BY-NC 3.0

     

    Class 14 ‘Teddy Bear’ D9526 – this loco was is now stabled outside on Number 1 road at Williton and is likely to remain there until the new year. When space becomes available in the loco shed, she will be going ‘indoors’ for some maintenance work, which will include attention to her bodywork, to make sure that she is in good shape for the 2025 running season.

     

    Class 47 47077 ‘NORTH STAR’ – this loco is based at Grosmont on the North Yorkshire Moors Railway but has been out of service because of a coolant leak from the liner of cylinder B3. The repair work has now been completed by Heritage Rail Ltd and the loco is ready to begin a short programme of test running to confirm that she is ready to return to work.

     

    Andrew Barclay 0-4-0DH 578 – this useful little loco is fully serviceable and is waiting for her next opportunity to shunt the yard at Williton.

     

     

    BOOK REVIEW: the FOURTH volume in ‘THE BEATEN TRACK’ series by Andy Chard is now available and in stock at Williton. The standard set by Andy’s first volume was repeated admirably in the second and third volumes, and the success of the format continues with high levels of advance sales for this much-anticipated volume 4.

    GET YOUR COPY FROM THE DEPG and help us maintain your favourite loco fleet while enjoying a very good read !

    Click here or on the image below to go the DEPG online store where this book is available from stock for £34.95 per copy.

     

     

    ON SHED: apologies, but we will need to skip this popular feature this week due to lack of time.

     

    DEPG NEWS:  the next Board Meeting will take place at Williton on Saturday 19th October. if you are a member of the DEPG and would like to have a question placed before the Board, then please let us know by replying to this email or by using our CONTACT FORM. If you are not a member, then PLEASE JOIN US !

     

    The DEPG is a charity and is run entirely by volunteers, many of whom give both their time and their money to the continuance of work on the locos in the DEPG fleet. If you have been enjoying the roundup for free, have you considered joining us for just £1 a month ? You can then add your name to all of those helping out on the above projects and play your part in the future of our locos for a lot less than the price of a cup of coffee!

     

    JOIN US using whichever membership class is appropriate for your situation and means. CLICK HERE or on the image below or use the QR code to get the details.

         

     

    If you would like to go one step further and come along to help with the work on the locos in our fleet, then please use our CONTACT FORM to let us know that you would like to volunteer and we will respond with more details.

    We look forward to hearing from you !

     

    Go to the previous Weekly Roundup post

  • Weekly Roundup – 29-Sep-24

    Both Class 33 ‘Crompton’ D6566 (33048) and the photographer were enjoying the sunshine on Saturday 28th September 2024 as the loco approached the Stogumber station stop en route to Bishops Lydeard. The ’33’ was working the 80-mile diagram that had originated at Minehead. Photo by Mark Ireland © CC BY-NC 3.0

     

    Last weekend saw the last of the BLUE timetable workings that will be diesel hauled this year, with Class 33 ‘Crompton’ D6566 (33048) in use on Saturday and Sunday. The timetable now reduces to the 3-times daily service provided by the RED timetable, with diesel power only required for Sundays 6th, 13th and 20th October, although a ‘bonus’ day has been added for Saturday 5th due to the non-availability of the booked steam loco. The final week of timetabled service at the end of October will be all-steam because it is likely to be too cold to operate unheated trains. Although the ’33s’ are capable of providing Electric Train Heating (ETH), there are no compatible coaches in use on the WSR at present, so our operating period is restricted to the warmer months.

    On Sunday 29th, the ’33’ was out and about again, but this time carrying a special headcode to mark the birthday of DEPG Trustee and volunteer TOM COURTNEY who happened to be on duty as secondman that day. Although bright at first, the weather took a marked turn for the worse as the day progressed, but that did not present any problems to the 1961-vintage loco.

    Class 33 ‘Crompton’ D6566 (33048) in the foreground with Ashley, Tom and Ian on the platform at Williton and (L-R) Class 14 ‘Teddy Bear’ D9526, Barclay 578 (ROF 1), Class 35 ‘Hymek’ D7018, Class 33 ‘Crompton’ D6575 (33057), Class 52 D1010 ‘WESTERN CAMPAIGNER’ and GWR 4-6-0 7812 ‘ERLESTOKE MANOR’ in view. Image taken from the Williton Railcam courtesy of Railcam UK and the WSR © CC BY-NC 3.0

     

     

    DIESEL RUNNING DATES

    Keep an eye on our DIESEL RUNNING DATES page for details of diesel-hauled public services and sign up to our DIESELGEN email bulletin service to get advance notice of non-public service running. 

     

    Click here to join the DEPG

    Click here to go to our DIESEL RUNNING DATES page

    Click here to go to our ONLINE SHOP

    Click here to support D1010

    Thank you very much for your support !

     

     

    LOCO NEWS:

    Class 52 D1010 ‘WESTERN CAMPAIGNER’with so many component parts now removed from the ‘B’ bogie occupying floor space in the loco shed, it became necessary to spend some time working on cleaning up and inspecting some of the most important parts. There is a lot more detailed inspection and measurement to do, but first indications were positive and no ‘horrors’ have emerged. This is very encouraging and allows us to press ahead to arrange the Non-Destructive Testing (NDT) of the key suspension components, to make sure that there are no cracks or internal fractures that are not visible to the naked eye. The equipment to do this is available at West Somerset Restorations in the ‘Swindon Shed’ to the north of our yard at Williton.

    The general scheme of work on the ‘B’ bogie is as follows, with status information added:

    1. Remove the cardan shafts – completed on 10th August (the shafts will be sent out for overhaul)
    2. Remove the brake rigging – completed on 24th August
    3. Remove the primary springs – completed on 24th August (the springs will be sent out for overhaul)
    4. Remove the equalising beams and pedestals – completed on 21st September.
    5. Remove the secondary springs – planned for the week ending 20th October
    6. Inspect the bogie frames, wheel bearings and gearboxes
    7. Replace the torque reaction rubbers
    8. Re-assemble using repaired or replacement parts as required.

     

    With the work taking place inside the loco shed already absorbing the available resources, the Chairman and Vice Chairman were left with the task of distributing the contents of six bulk bags of aggregates underneath the loco body to create a suitably flat surface above rail height for volunteers to be able to work on the underside of the loco, in readiness for a major clean up effort at some time in the near future. The result is both safer and much comfortable for our volunteers.

    As always, there is plenty to do on this massive locomotive, so please CONTACT US if you are a DEPG member and would like to come along to help.

    D1010 – some of the ever-growing collection of component parts that have been removed from the ‘B’ bogie were pictured at Williton on Saturday 14th September 2024. Photo by Andy Royal © CC BY-NC 3.0

     

    D1010 – the DEPG Chairman was pictured while at work under the ‘A’ end of the loco (with appropriate headgear) spreading the contents of six bulk bags of aggregates that were used to create a flat and safe working surface. Pictured at Williton on Saturday 28th September 2024 by Andy Royal © CC BY-NC 3.0

     

    D1010 – the DEPG Chairman then re-positioned the barriers around the loco and performed a walk-around to make sure that the area was tidy and safe. Pictured at Williton on Saturday 28th September 2024 by Andy Royal © CC BY-NC 3.0

     

    D1010 – the stands are marked to identify the four loading points, the heights of which are measured on a regular basis to ensure that the loco body remains stable and securely supported. Measurements confirm that there has been no movement since the loco was first placed on the stands in July. Pictured at Williton on Saturday 28th September 2024 by Andy Royal © CC BY-NC 3.0

     

     

    Please help us with this very important work by making a donation to the D1010 Restoration Fund and support the repair work that is taking place right now. Thank you in advance for your help.

          

    We are still offering the SPONSOR A PATCH scheme where your name or message will be engraved into the metal of the loco body as acknowledgement of your donations to the D1010 RESTORATION FUND. We are a bit behind with the engraving but now that the loco body has been determined as safe to work on (and when weather permits!), we can resume the engraving and catch up. There is plenty more metal yet to be engraved, so GET YOUR SPONSORED PATCH BY CLICKING THIS LINK !

     

     

    Class 09 D4107 (09019) – this loco is based at Bishops Lydeard and is in regular use in support of WSR activities. She will move to Williton in early November to undergo body repairs and a repaint, along with some other maintenance activities that are aimed at keeping her reliable and available for service.

     

    Class 33 D6566 (33 048) – This loco has now moved to Bishops Lydeard to continue in her role as Duty Loco. Her next booked duties are under the RED TIMETABLE on Saturday 5th and Sunday 6th October.

     

    Class 33 D6575 (33 057) – this loco has returned to Williton and has undergone an ‘A’ exam. The loco is now ready for service if called upon. In between other tasks, volunteer loco manager Ian R took measurements from the valve guides that were removed from the spare cylinder heads, in preparation for the refurbishment of the spare heads for possible use on D6575 in the future.

    D6575 – two of the valve guides from the Sulzer type LDA cylinder heads were inspected for wear by volunteer loco manager Ian R at Williton on Saturday 28th September 2024. Photo by Andy Royal © CC BY-NC 3.0

     

     

    Class 35 ‘Hymek’ D7017 – this loco has had a great season, achieving 100% dispatch reliability and delivering consistent and excellent performances. She will remain at Minehead for a while so that she can be assessed for body repairs and repainting before eventually moving back to Williton for other repairs and winter maintenance.

     

    Click on this link or on the graphic below to visit our DIESEL RUNNING DATES page.

     

     

    Class 35 ‘Hymek’ D7018 – the transmission that is being repaired at Williton at the moment is one of very few surviving examples of the type, and we need to minimise the risk of damaging this transmission, which could be the outcome if we put it back into service before we are sure that it is operating correctly.

    On completion of an overhaul in BR days, the transmission would have been installed in a test rig where it could be put through its paces at maximum speed and maximum power, but such a rig is massive and the output from the transmission has to be loaded by a dynamometer which then has to dissipate more than 1 Megawatt of power, so it is not a trivial piece of kit.

    In place of this, we intend to perform a functional test of the overhauled control block to make sure that the inputs and outputs are in line with expectations, then we will install the transmission in the loco and carry out a series of static tests before applying power. After that, there will be a programme of test running to build up confidence and prove the reliability. This programme of testing is defined by a Test Plan and the last week has been dedicated to drafting this plan in preparation for a review meeting that will take place on Saturday 6th October.

    So, there are no photos of the overhaul this week, but we will be sharing a summary of the agreed test plan in a future roundup.

     

    Two years ago – Class 35 ‘Hymek’ D7018 was pictured on the approach to Blue Anchor station with the 12:30 service from Bishops Lydeard. Photo dated Sunday 25th September 2022 by Glyn Warren © CC BY-NC 3.0

     

     

    Please help us with this very important work by making a donation to DEPG funds and allowing us to support the repair work that is taking place on D7018 right now. Thank you in advance for your help.

          

     

     

    Class 14 ‘Teddy Bear’ D9518 – the ‘Tuesday Team’ are continuing with the overhaul of the Paxman ‘Ventura’ 6YJXL engine that was previously installed in sister loco D9526 in parallel with the work that is taking place on the cab assembly. The cab roof section that was being worked on by Andy P last week has now got into the hands of Colin G so that he can restore it in an authentic way, complete with 1960s ‘pegboard’ lining and aluminium trim. The Class 14s were built to a very high standard by BR Swindon Works and Colin is aiming to reach the same heights. Well done Team D9518 !

    D9518 – the interior details of the removable cab roof section are being carefully restored in an authentic way by volunteer Colin G. Pictured at Williton on Saturday 28th September 2024 by Andy Royal © CC BY-NC 3.0

     

    Click here or on the image below to make a donation towards the restoration of D9518Thank you very much for your support !

     

     

    Class 14 ‘Teddy Bear’ D9526 – this loco was is now stabled outside on Number 1 road at Williton and is likely to remain there until the new year. When space becomes available in the loco shed, she will be going ‘indoors’ for some maintenance work, which will include attention to her bodywork, to make sure that she is in good shape for the 2025 running season.

     

    Class 47 47077 ‘NORTH STAR’ – this loco is based at Grosmont on the North Yorkshire Moors Railway but has been out of service because of a coolant leak from the liner of cylinder B3. The repair work was contracted out to Heritage Rail Ltd and the work was taking place in the first week of October. We hope to see the loco out and about again during October.

     

    Andrew Barclay 0-4-0DH 578 – this useful little loco is fully serviceable and is waiting for her next opportunity to shunt the yard at Williton.

     

     

    BOOK REVIEW: a new release this week is the FOURTH volume in ‘THE BEATEN TRACK’ series by Andy Chard. The standard set by Andy’s first volume was repeated admirably in the second and third volumes, and the success of the format continues with high levels of advance sales for this much-anticipated volume 4.

    GET YOUR COPY FROM THE DEPG and help us maintain your favourite loco fleet while enjoying a very good read !

    Click here or on the image below to go the DEPG online store where this book is available from stock for £34.95 per copy.

     

    DEPG CALENDAR 2025

    The DEPG 2025 CALENDAR is now available for mailing, comprising 14 printed pages of A3 (twice A4 size) glossy paper on a spiral wire binder. This calendar features the DEPG’s locomotives, both in service and in preservation, with all of the photos being provided by members and supporters. Click here or on the image above to GET YOUR COPY – WHILE STOCKS LAST – for £14 plus p&p.

     

     

    ON SHED: last week, we shared a photo and a reminiscence from DEPG member Trevor Tremethick in relation to the 23:45 service from Paddington to Penzance in the mid 1970s. Some fifty years later, roundup reader Michael Newman commented thus:

         “Had to laugh at Trevor’s comments regarding the journey details of his photo of the 23:45 Paddington to Penzance with 1010 in the 1970s because I had done this journey recently with the awful sounding Class 57s. The actual trip was ruined by freezing cold air conditioning and floodlight-like lighting which wasn’t dimmed all night ! I wouldn’t recommend that journey to anyone.”

    Many thanks to Michael for sharing his experience. Do you have a story to tell ? Please share it with us all.

     

    Here’s another image from Trevor’s collection, this time featuring our first acquisition – Class 35 ‘Hymek’ D7017, pictured in the repair shop at Old Oak Common with the roof section above the engine removed, just 6 months before the end of ‘Hymek’ workings on BR. By this time, D7017 was one of only ten examples of the class remaining in service, so a visit to the repair shop would have been dicing with death. Lucky for us, the loco made it right through to the end, being withdrawn on 13th March 1975, just three days before the very last survivor, sister DEPG loco D7018.

    Many thanks to Trevor for sharing his photo with us all.

    Class 35 ‘Hymek’ D7017 is pictured inside the Repair Shop at Old Oak Common depot on Saturday 21st September 1974, surrounded by spare bogies and with the roof off, no doubt a scary experience for the loco at that late point in her career. Photo by Trevor Tremethick © CC BY-NC 3.0

     

     

    DEPG NEWS:  the next Board Meeting will take place at Williton on Saturday 19th October. if you are a member of the DEPG and would like to have a question placed before the Board, then please let us know by using our CONTACT FORM. If you are not a member, then PLEASE JOIN US !

     

    The DEPG is a charity and is run entirely by volunteers, many of whom give both their time and their money to the continuance of work on the locos in the DEPG fleet. If you have been enjoying the roundup for free, have you considered joining us for just £1 a month ? You can then add your name to all of those helping out on the above projects and play your part in the future of our locos for a lot less than the price of a cup of coffee!

     

    JOIN US using whichever membership class is appropriate for your situation and means. CLICK HERE or on the image below or use the QR code to get the details.

         

     

    If you would like to go one step further and come along to help with the work on the locos in our fleet, then please use our CONTACT FORM to let us know that you would like to volunteer and we will respond with more details.

    We look forward to hearing from you !

     

    Go to the previous Weekly Roundup post

  • Weekly Roundup – 22-Sep-24

    Class 35 ‘Hymek’ D7017 was in use on the weekend of 21st/22nd September and ran with special headboards on both days. The Saturday workings carried a ‘WESTERN TALISMAN’ headboard in memory of DEPG volunteer MIKE EVANS who passed away last year. Pictured at Bishops Lydeard by Barrie Childs  © CC BY-NC 3.0

     

    The weather took a dramatic turn for the worse last weekend, with low cloud and intense downpours reminding us all that summer was most definitely in retreat. However, the weekend was brightened up by the sight and sound of our Class 35 ‘Hymek’ D7017 in use on the 10:00 departures from Minehead and the subsequent 80-mile diagrams on the Saturday and Sunday.

    Being the last opportunity for diesel-hydraulic running this year (our diesel-electric ‘Cromptons’ still have five more workings booked – see our DIESEL RUNNING DATES page), we attached some special headboards to commemorate two of our friends and volunteers who passed away last year.

    D1007 ‘WESTERN TALISMAN’ was the favourite of MIKE EVANS and his special headboard adorned the loco on the Saturday, and D1051 ‘WESTERN AMBASSADOR’ was the favourite of CHRIS SHIELDS and his special headboard was carried on the Sunday. We miss both volunteers and we will always remember them.

    The Sunday was also the 51st anniversary of the ‘HYMEK SWANSONG‘ railtour that marked the end of scheduled passenger service use of the ‘Hymeks’, only ten of which survived through to the end of that year out of an original class strength of 101 examples. Several of the travellers on board the train last Sunday recounted their memories of the ‘Swansong’, adding to the significance of the event.

    Class 35 ‘Hymek’ D7017 was in use on the weekend of 21st/22nd September and ran with special headboards on both days. The Sunday workings carried a ‘WESTERN AMBASSADOR’ headboard in memory of DEPG volunteer CHRIS SHIELDS who passed away last year. Pictured at Bishops Lydeard by John Kite  © CC BY-NC 3.0

     

    The loco performed admirably and concluded her booked workings for 2024 by achieving a 100% availability result, which is a significant turnaround from the previous years and a credit to the hard work put in by Neil and the team at Williton. Well done team !

     

    DIESEL RUNNING DATES

    This weekend sees the last of the BLUE timetable (4 services each way per day) workings until the half-term week (end of October), with the RED timetable (three services each way per day) taking over from Tuesday next week. This gives us one running opportunity per week, which will be the 12:30 Bishops Lydeard to Minehead and return on Sundays 6th, 13th and 20th of October with Class 33 D6566 (33048) most likely to be covering all three. The last week of public services this year will be Saturday 26th October through Sunday 3rd November (Mon/Fri excepted) when the BLUE timetable will apply – but steam only (it will be a lot colder by then and the steam-operated carriage heating will no doubt be much appreciated!).

    Our versatile ‘Cromptons’ will find further running opportunities on non-public workings including two next week (a DIESELGEN bulletin will be sent out ASAP) and our Class 09 D4107 (09019) will continue to be in regular use at Bishops Lydeard right up to the end of the season, after which it will move to Williton for attention to bodywork and for various other light repairs and maintenance during the winter.

    Keep an eye on our DIESEL RUNNING DATES page for details of diesel-hauled public services and sign up to our DIESELGEN email bulletin service to get advance notice of non-public service running. 

     

    Click here to join the DEPG

    Click here to go to our DIESEL RUNNING DATES page

    Click here to go to our ONLINE SHOP

    Click here to support D1010

    Thank you very much for your support !

     

    LOCO NEWS:

    Class 52 D1010 ‘WESTERN CAMPAIGNER’ – the second of the two equalising beams presented less of a challenge to Gordon and Leroy on Saturday 21st, showing the benefit of experience gained by the removal of the first beam after an all-day struggle during the previous Saturday. If only there was a work instruction for this kind of overhaul, it would make life so much easier !

    The beam and the associated pedestal was then inspected for damage, but only showed the effects of wear in the bushings, with pick-up marks that were indicative of the lack of lubrication caused by the grease nipples being encased in solidified dirt and not being visible for many years. Each part will be thoroughly cleaned and inspected in fine detail before we decide on the repair or replacement of the part.

    The general scheme of work on the ‘B’ bogie is as follows, with status information added:

    1. Remove the cardan shafts – 100completed on 10th August
    2. Remove the brake rigging – 100completed on 24th August
    3. Remove the primary springs – 100completed on 24th August
    4. Remove the equalising beams and pedestals – 100% completed on 21st September.
    5. Remove the secondary springs – planned for the week ending 20th October
    6. Inspect the bogie frames, wheel bearings and gearboxes
    7. Replace the torque reaction rubbers
    8. Re-assemble using repaired or replacement parts as required.

    As always, there is plenty to do on this massive locomotive, so please CONTACT US if you would like to come along to help.

    D1010 – the equalising beams of the ‘B’ bogie have now been removed along with the so-called ‘pedestals’ that allow the beams to pivot in the centre. Pictured at Williton on Saturday 21st September 2024 by Andy Royal © CC BY-NC 3.0

     

    D1010 – the uppermost surface of the ‘pedestal’ includes two grease nipples that were buried for years in rock-hard solidified brake dust and had not seen an application of fresh grease since BR days. Pictured at Williton on Saturday 21st September 2024 by Andy Royal © CC BY-NC 3.0

     

    D1010 – the ‘pedestals’ are fabricated steel parts and include small tubes that feed the grease to the bushings that carry the pivots for the equalising beams. Pictured at Williton on Saturday 21st September 2024 by Andy Royal © CC BY-NC 3.0

     

    D1010 – the bushings in the ‘pedestals’ have suffered due to lack of lubrication, as witnessed by the pick-up marks on the outer surface of the bushing. These parts will be inspected and replaced as necessary. Pictured at Williton on Saturday 21st September 2024 by Andy Royal © CC BY-NC 3.0

     

    D1010 – the cooler group from the ‘B’ end was picked up by the Fork Lift Truck driven by Martin and moved out of the loco shed so that it could be turned over to allow repairs to continue on the other side. Pictured at Williton on Saturday 21st September 2024 by Andy Royal © CC BY-NC 3.0

     

    D1010 – the cooler group from the ‘B’ end was turned over and then placed on spacers on the adjacent road so that welding repairs and repainting could be completed on the side that was previously inaccessible. Stalwart volunteer Roy inspected the huge assembly to pick out the next target for his paintbrushes. Pictured at Williton on Saturday 21st September 2024 by Andy Royal © CC BY-NC 3.0

     

    Please help us with this very important work by making a donation to the D1010 Restoration Fund and support the repair work that is taking place right now. Thank you in advance for your help.

          

    We are still offering the SPONSOR A PATCH scheme where your name or message will be engraved into the metal of the loco body as acknowledgement of your donations to the D1010 RESTORATION FUND. We are a bit behind with the engraving but now that the loco body has been determined as safe to work on (and when weather permits!), we can resume the engraving and catch up. There is plenty more metal yet to be engraved, so GET YOUR SPONSORED PATCH BY CLICKING THIS LINK !

     

    Class 09 D4107 (09019) – this loco is based at Bishops Lydeard and is in regular use in support of WSR activities. At the end of the season, she will move to Williton to undergo body repairs and a repaint, along with some other maintenance activities that are aimed at keeping her reliable and available for service.

     

    Class 33 D6566 (33 048) – This loco has taken up the role of Duty Loco at Minehead. Her next booked duties are under the BLUE TIMETABLE on Saturday 28th and Sunday 29th September.

     

    Class 33 D6575 (33 057) – this loco has returned to Williton and has undergone an ‘A exam. The loco is now ready for service if called upon.

     

    Class 35 ‘Hymek’ D7017 – this loco will remain at Minehead for a while so that she can be assessed for body repairs and repainting. The loco will eventually move back to Williton for other repairs and winter maintenance.

     

    Click on this link or on the graphic below to visit our DIESEL RUNNING DATES page.

     

     

    Class 35 ‘Hymek’ D7018 – the rate of progress has notched up again as the team return from their summer vacations and pick up where they left off. The new (and expensive) bearing for the primary shaft had now been delivered, installed and checked for correct operation and dimensioning. The first layer of the control block was then re-installed into the top housing and carefully inspected in readiness for the next layer to be added. Every step is logged and checked to make sure that nothing is missed. These transmissions are too precious to take chances with.

    D7018 – the brand new bearing for the primary shaft of the 4-speed geartrain was fitted at Williton on Monday 16th September 2024. Photo by Colin Foxhall © CC BY-NC 3.0

     

    D7018 – the first layer of the control block was installed and inspected at Williton on Tuesday 17th September 2024. Photo by Colin Foxhall © CC BY-NC 3.0

     

    D7018 – meanwhile, the loco minus its transmission is destined to remain outdoors and be subjected to the Great British climate. Pictured at Williton on Sunday 22nd September 2024 by Josh Brinsford © CC BY-NC 3.0

     

    Please help us with this very important work by making a donation to DEPG funds and allowing us to support the repair work that is taking place on D7018 right now. Thank you in advance for your help.

          

     

     

    Class 14 ‘Teddy Bear’ D9518 – the ‘Tuesday Team’ are powering ahead with the overhaul of the Paxman ‘Ventura’ 6YJXL engine that was previously installed in sister loco D9526. The pistons and cylinder liners have been removed from the engine and will undergo careful cleaning, inspection and measurement to determine if they are fit for further service. The team were diverted on Saturday 21st by the need to work sister D9526 to Minehead and back for an underframe inspection, but Andy P remained at the depot to work on the restoration of the cab roof – a very good sign that the cab is well on the way towards full restoration.

    D9518 – the aluminium cab roof was the subject of Andy P’s attention at Williton on Saturday 21st September 2024. Photo by Andy Royal © CC BY-NC 3.0

     

    Click here or on the image below to make a donation towards the restoration of D9518Thank you very much for your support !

     

     

    Class 14 ‘Teddy Bear’ D9526 – this loco was worked to Minehead on Saturday 21st along with ‘Hymek’ D7017 and Class 33 ‘Crompton’ D6566 (33048) so that she could be positioned over the pit for an underframe exam and a brake adjustment. The loco returned to Williton later that same day, working ‘Light Engine’, with Class 33 D6575 (33057) in tow, the two ‘Cromptons’ having been swapped at Minehead.

    L-R: Class 33 ‘Crompton’ D6575 (33057) was towed to Williton by Class 14 ‘Teddy Bear’ D9526 on Saturday 21st September 2024, the ’14’ having been over the pit at Minehead for an underframe inspection and the ’33’ having been swapped over with sister D6566 (33048) so that she could return to Williton and undergo an ‘A’ exam. The ‘A’ bogie of D1010 can be seen on the right. Photo by Andy Royal © CC BY-NC 3.0

     

    Class 47 47077 ‘NORTH STAR’ – this loco is based at Grosmont on the North Yorkshire Moors Railway but is currently out of service because of a coolant leak from the liner of cylinder B3. Only one of the 12 cylinders appears to be affected, but further investigations will be carried out as part of the repair work. A subcontractor has been engaged to allow the work to proceed quickly, and the completion date is scheduled for early October.

     

    Andrew Barclay 0-4-0DH 578 – this useful little loco is fully serviceable and is waiting for her next opportunity to shunt the yard at Williton.

     

    If you can help by donating your time to any of these projects, then please JOIN US and come along to the depot for an introduction to what we do and how we do it. We currently have volunteers on site from Saturday through to Tuesday and we can open on other days if we can be sure of getting at least two volunteers on site at all times, so there is plenty of scope. We have tasks of all types to suit most capabilities, both skilled and unskilled.

    Many thanks to all of our volunteers who give up so much of their time to work on the cleaning, painting, maintaining, restoring, managing and fund raising for our fleet of heritage locomotives !

     

     

    BOOK REVIEW: after several weeks of promoting the CLASS 22 BOOKS, we need to make our readers aware of some bargains that are available via our ONLINE STORE in the form of several pre-owned books that have been reduced in price to stimulate sales. Take a look at these and other titles by clicking this link or by clicking on the images below:

    APT – A Promise Unfulfilled – Reduced to £15.00

    BR in the EIGHTIES – Reduced to £2.50

    Barclay 150 1840-1990 – Reduced to £5.00

    BR Traction in Colour – 2 – Reduced to £2.00

    MANY THANKS to all who have donated books to the DEPG and thanks also to those who have bought them, with every purchase generating funds for the upkeep of the DEPG loco fleet.

     

     

    The DEPG 2025 CALENDAR is now available for mailing, comprising 14 printed pages of A3 (twice A4 size) glossy paper on a spiral wire binder. This calendar features the DEPG’s locomotives, both in service and in preservation, with all of the photos being provided by members and supporters. Click here or on the image above to GET YOUR COPY – WHILE STOCKS LAST – for £14 plus p&p.

     

     

    ON SHED: this week, we are not quite ‘on shed’ because the loco still has 30 miles to run before it can take a rest at it’s destination, but here’s a photo that is crying out for sharing. The loco is our very own D1010 ‘WESTERN CAMPAIGNER’ and this photo and the narrative below have been kindly provided to us by new member Trevor Tremethick. Here are Trevor’s words on the subject:

         “1010 is on the 23.45 Paddington to Penzance, Truro 12.08.74. It was a horrible train that dragged around Swindon, Chippenham, Bath and Bristol, and didn’t get into Truro until 0815 the next morning. We called it ‘The Rigor Mortis’ as the passengers were rather ‘stiff’ by the time they got off at Truro! Some had to go on to Penzance of course. The headcode was 1B83. I suffered this train on several occasions coming home from London.”

    Many thanks to Trevor for sharing his photos and his memories with us all.

     

    Class 52 D1010 ‘WESTERN CAMPAIGNER’ was pictured at 08:15 on the morning of Monday 12th August 1974 when departing from the Truro station stop with the 1B83 Paddington to Penzance service. This train had departed from Paddington at 23:45 the previous day, using the ‘Great Way Round’ route ! The DMU on the right is on the Falmouth branch that still enjoys an intensive shuttle service today. Photo by Trevor Tremethick © CC BY-NC 3.0

     

     

    DEPG NEWS:  the Williton Infrastructure Division (WID for short) is the tongue-in-cheek moniker for two of our long-serving volunteers, Paul Tucker and Graham Perry, who team up several times a month to stay over at Williton for a long weekend and focus on making infrastructure improvements, with activities ranging from major ground works for additional ISO containers through to minor but essential items such as making sure that the kettles are working in the mess room ! We will leave you to guess at which activity is considered as the most important.

    One of several tasks that they dealt with last weekend was the tidying up of the DEPG’s extensive collection of lifting tackle, all of which had been subjected to its 6-monthly inspection a few weeks beforehand and colour coded red to show that it had been passed as fit for use by the insurance assessor. The colour will change in 6 months and the new colour will be applied to those items that pass the next inspection. This is a simple but effective method that is widely used in industrial and workshop environments.

    Here’s a photo of the upgraded storage area for the lifting equipment, nice and tidy with labelling applied to each hook to identify the item that should be hanging there. Let’s hope that our volunteers keep it tidy and properly organised.

    The lifting tackle storage area at Williton was re-organised by the ‘Williton Infrastructure Division’ over the weekend of 21st/22nd September 2024. Photo by Martin Howard © CC BY-NC 3.0

     

    Many thanks to the ‘WID’, whose efforts often go unreported and seldom hit the headlines, but are making constant progress towards enhancing the facilities and capabilities of the DEPG. Well done guys !

     

    The DEPG is a charity and is run entirely by volunteers, many of whom give both their time and their money to the continuance of work on the locos in the DEPG fleet. If you have been enjoying the roundup for free, have you considered joining us for just £1 a month ? You can then add your name to all of those helping out on the above projects and play your part in the future of our locos for a lot less than the price of a cup of coffee!

     

    JOIN US using whichever membership class is appropriate for your situation and means. CLICK HERE or on the image below or use the QR code to get the details.

         

     

    If you would like to go one step further and come along to help with the work on the locos in our fleet, then please use our CONTACT FORM to let us know that you would like to volunteer and we will respond with more details.

    We look forward to hearing from you !

     

    Go to the previous Weekly Roundup post

  • Weekly Roundup – 15-Sep-24

    A bit of a surprise on the first day of the WSR’s ‘FORTIES EVENT’ – Class 33 ‘Crompton’ D6575 (33057) was attached at the rear of the 10:40 Bishops Lydeard to Minehead service. The 1960’s loco was being moved to Minehead to provide cover for a steam loco that was giving a bit of trouble. In the end, the diesel was not needed until the following day. Pictured at Crowcombe Heathfield with WSR ‘Mogul’ 9351 on Saturday 14th September 2024 by Josh Brinsford © CC BY-NC 3.0

     

    The WSR took on a 1940s look for the weekend of 14/15th September as each station along the line hosted a range of special activities with a 1940s theme, everything from unexploded bombs through to song and dance. The blue skies of the Saturday had clouded over by the Sunday, but the weather remained good and the event was very well attended, with several additional trains running and wartime goods trains adding to the interest on the Saturday.

    On the Sunday, one of the steam locos developed a fault so the goods trains had to be cancelled and our Class 33 ‘Crompton’ D6575 (33057) was ‘requisitioned by the authorities’ and pressed into action on four passenger services, to ensure that the full published passenger service was provided. Very useful locos, these Class 33s !

     

     

    DIESEL RUNNING DATES

    Class 35 ‘Hymek’ D7017 will be hauling the BLUE timetable diesel turns on Saturday 21st and Sunday 22nd September with 80 miles of haulage available each day.

    As the ‘Hymek’ is currently stabled at Williton, there will be a ‘Light Engine’ working on Saturday morning, leaving Williton at 0900 and arriving at Minehead at 0935 so that the ‘Hymek’ can take up position at the head of the 10:00 service to Bishops Lydeard.

    Catching a ride behind D7017 will be Class 14 ‘Teddy Bear’ D9526 and Class 33 ‘Crompton’ D6566 (33048), both going to Minehead for different reasons. The ’14’ will position over the pit at Minehead so that an underframe inspection can be carried out. The ’33’ is fresh from an ‘A’ exam at Williton and will take over as Duty Loco from sister D6575 (33057) who will in turn catch a ride behind D9526 when she returns to Williton later in the day. These additional workings should make for some interesting photo opportunities. See our DIESELGEN bulletin for more details.

    Keep an eye on our DIESEL RUNNING DATES page for details of diesel-hauled public services and sign up to our DIESELGEN email bulletin service to get advance notice of non-public service running. 

     

    Click here to join the DEPG

    Click here to go to our DIESEL RUNNING DATES page

    Click here to go to our ONLINE SHOP

    Click here to support D1010

    Thank you very much for your support !

     

     

    LOCO NEWS:

    Class 52 D1010 ‘WESTERN CAMPAIGNER’the hard work on the ‘B’ bogie resumed on Saturday 14th as the team, comprising Gordon, Ian F and Thomas, turned their attention to the equalising beams that distribute the weight between the outermost pair of axles in the bogie. The beams are hung from inverted ‘pedestals’ that are bolted into place within the bogie frame and are very difficult to access, especially when plastered with dirt and grease. After many hours spent cleaning and preparing, the retaining bolts on the pedestal bearings were eventually released and the first of the two equalising beams extracted. The associated pedestal was then easy to access and removal took a matter of minutes. Having done the first one, the others should be ‘easy’ ….. but everything is relative !

    The general scheme of work on the ‘B’ bogie is as follows, with status information added:

    1. Remove the cardan shafts – 100% completed on 10th August
    2. Remove the brake rigging – 100% completed on 24th August
    3. Remove the primary springs – 100% completed on 24th August
    4. Remove the equalising beams and pedestals – 50% completed on 14th September.
    5. Remove the secondary springs
    6. Inspect the bogie frames, wheel bearings and gearboxes
    7. Replace the torque reaction rubbers
    8. Re-assemble using repaired or replacement parts as required.

    As always, there is plenty to do on this massive locomotive, so please CONTACT US if you are a DEPG member and would like to come along to help.

    D1010 – volunteer Ian F was hard at work preparing for the extraction of the equalising beams of the ‘B’ bogie at Williton on Saturday 14th September 2024. Photo by Andy Royal © CC BY-NC 3.0

     

    D1010 – the first of the two equalising beams of the ‘B’ bogie sees the light of day after 50+ years of being incarcerated inside the bogie frame. Pictured at Williton on Saturday 14th September 2024 by Andy Royal © CC BY-NC 3.0

     

    D1010 – and it’s out, complete with the ‘pedestal’ that allows it to pivot and transfer the load from one axle to another. The only issue is that it pivots a little too easily due to the amount of wear in the bearings. Some remedial work is required. Pictured at Williton on Saturday 14th September 2024 by Andy Royal © CC BY-NC 3.0

     

    D1010 – the component parts of the ‘pedestal’ that sits inside the bogie frame and carries the equalising beam that transfers some of the load from one axle to another. Pictured at Williton on Saturday 14th September 2024 by Andy Royal © CC BY-NC 3.0

     

    Please help us with this very important work by making a donation to the D1010 Restoration Fund and support the repair work that is taking place right now. Thank you in advance for your help.

          

    We are still offering the SPONSOR A PATCH scheme where your name or message will be engraved into the metal of the loco body as acknowledgement of your donations to the D1010 RESTORATION FUND. We are a bit behind with the engraving but now that the loco body has been determined as safe to work on, we can resume the engraving and catch up. There is plenty more metal yet to be engraved, so GET YOUR SPONSORED PATCH BY CLICKING THIS LINK !

     

     

    Class 09 D4107 (09019) – this loco is based at Bishops Lydeard and is in regular use in support of WSR activities. At the end of the season, she will move to Williton to undergo body repairs and a repaint, along with some other maintenance activities that are aimed at keeping her reliable and available for service.

    Class 09 Shunter D4107 (09019) was basking in the sunshine at Bishops Lydeard when pictured on Sunday 15th September 2024. Photo by Josh Brinsford © CC BY-NC 3.0

     

     

    Class 33 D6566 (33 048) – This loco will take up the role of Duty Loco when she arrives at Minehead on Saturday 21st September. Her next booked duties are under the BLUE TIMETABLE on Saturday 28th and Sunday 29th September.

     

    Class 33 D6575 (33 057) – this loco will return to Williton on Saturday 21st September to undergo an ‘A exam and several other items of planned maintenance.

     

    Class 35 ‘Hymek’ D7017 – this loco is stabled at Williton and will be moving to Minehead to take up her duties on the diesel diagram of the BLUE TIMETABLE on Saturday 21st and Sunday 22nd September

     

    Click on this link or on the graphic below to visit our DIESEL RUNNING DATES page.

     

     

    Class 35 ‘Hymek’ D7018 – our ‘transmission team’ were back in the saddle with immediate results on Monday and Tuesday 9th/10th September with an excellent balance of action and care. The photos show that the re-assembly of the transmission is moving forward, but with trial assembly of each stage to allow measurements to be taken and the necessary clearances obtained and verified. This careful approach will pay dividends and allow us to have the required level of confidence when we get to the testing phase in the near future.

    D7018 – the oil pump was disassembled to check for cleanliness and damage. Everything was OK but the bearings were not great so they were exchanged with those from the ‘good spare’. Pictured at Williton on Monday 9th September 2024 by Colin Foxhall © CC BY-NC 3.0

     

    D7018 – the massive torque converter assembly was trial fitted to the primary geartrain shaft of the transmission at Williton on Tuesday 10th September 2024. Photo by Colin Foxhall © CC BY-NC 3.0

     

    D7018 – having the torque converter in position allowed the end float of the primary geartrain shaft to be measured at the far end. Pictured at Williton on Tuesday 10th September 2024 by Colin Foxhall © CC BY-NC 3.0

     

    Please help us with this very important work by making a donation to DEPG funds and allowing us to support the repair work that is taking place on D7018 right now. Thank you in advance for your help.

          

     

     

    Class 14 ‘Teddy Bear’ D9518 – the team are powering ahead with the overhaul of the Paxman ‘Ventura’ 6YJXL engine that was previously installed in sister loco D9526. The pistons and cylinder liners were removed from the engine, exposing the crankshaft journals, all of which were in very good condition. Here are some photos:

    D9518 – the six pistons from the Paxman ‘Ventura’ 6YJXL engine were removed and arranged on the steel table in front of the ‘Tuesday Team’ (L-R, Terry, Nick, Tony and Linda) at Williton on 10th September 2024. Photo by Mark Bladwell © CC BY-NC 3.0

     

    D9518 – the six cylinder liners were also removed for inspection and to allow the sealing surfaces to be cleaned and inspected. So far so good ! Pictured at Williton on 14th September 2024 by Andy Royal © CC BY-NC 3.0

     

    Click here or on the image below to make a donation towards the restoration of D9518Thank you very much for your support !

     

     

    Class 14 ‘Teddy Bear’ D9526 – this loco is moving to Minehead on Saturday 21st (along with ‘Hymek’ D7017) and will then position over the pit for an underframe exam and a brake adjustment. The loco will return to Williton later that same day, working ‘Light Engine’, with Class 33 D6575 (33057) in tow.

     

    Class 47 47077 ‘NORTH STAR’ – this loco is based at Grosmont on the North Yorkshire Moors Railway but is currently out of service because of a coolant leak from the liner of cylinder B3. Only one of the 12 cylinders appears to be affected, but further investigations will be carried out as part of the repair work. A subcontractor has been engaged to allow the work to proceed quickly, and the completion date is scheduled for early October.

     

    Andrew Barclay 0-4-0DH 578 – our loco may not have been used much during these last few weeks but her twin sister, number 579 (ROF 2), has been busy, moving ex-GWR coaches from Dunster sidings to the new West Somerset Railway Heritage Trust (WSRHT) workshop at Washford, where restoration can take place under cover. The moves were performed as ‘top-and-tail’ with Class 03 shunter D2133 at the rear and at walking pace, because these coaches have not moved in a very long time.

    Barclay 579 (ROF2) was in use to haul several ex-GWR coaches from Dunster Sidings to Washford on Monday 9th September 2024. Each coach was moved separately at walking pace with the Barclay in the lead and Class 03 shunter D2133 at the rear. Photo by the WSRHT © CC BY-NC 3.0

     

    BOOK REVIEW: with the closedown news from PROJECT 22 reported in the Roundup for 25-Aug-24 still fresh in our minds, we will continue to feature Anthony Sayer’s detailed analysis of the Class 22 for one more week and we will also include the Class in the ‘ON SHED’ feature further below. Both volumes of these books are in stock and ready for those who want to learn more about these extinct machines. Even though they were seldom at the top of the loco spotter’s list of favourites, they still have a right to exist and it is sad that not a single example of Classes 16, 21, 22, 29, 41 or 43 remain, a total of 164 main line locomotives that were built in Glasgow for BR by the North British Locomotive Company.

    To find out more, consider purchasing VOLUMES 1 and 2 of THE NORTH BRITISH CLASS 22 by Anthony P. Sayer.

             

               VOLUME 1 – Setting the Scene                                   VOLUME 2 – Detailed Insights

     

    Volume 1 tells the story of the origins and development of the NBL Class 22 locos, and covers each member of the class in some detail, in the usual style of the author. Volume 2 delves into their service record and extensive modifications list, ending with details on their final disposal. None were saved.

    Highly recommended and offered at £26 per copy via the DEPG online storeClick here or on the image above to get your copy and in doing so, support the DEPG !

     

     

    The DEPG 2025 CALENDAR is now available for mailing, comprising 14 printed pages of A3 (twice A4 size) glossy paper on a spiral wire binder. This calendar features the DEPG’s locomotives, both in service and in preservation, with all of the photos being provided by members and supporters. Click here or on the image above to GET YOUR COPY – WHILE STOCKS LAST – for £14 plus p&p.

     

     

    ON SHED: one more photo on the Class 22 theme before we move on, again from regular contributor BARRY GAY, this one taken on a Wednesday afternoon in September 1971, almost exactly 53 years ago, at Hemyock, a villiage in the Blackdown Hills near the Devon-Somerset border, 5 miles south of Wellington. This was the terminus of a branch line from Tiverton Junction that had been built as the Culm Valley Light Railway back in 1876, and was kept alive until 1975 by the existence of a United Dairies creamery. Here are Barry’s words on the subject:

         “D6336 shunting milk tanks at Hemyock on Wednesday, September 22, 1971. The Class 22 worked in with the empties from Exeter at 15.35, leaving with 5 full tanks at 16.30. The Hemyock and Torrington milk trains continued with Class 22s until the end of the year, in fact until Saturday, January 1, 1972 when D6339 worked the last Class 22-hauled Hemyock and D6333 the last Torrington. Both trains arrived at Exeter St Davids within 5 minutes of each other, uncoupled, with the locos going to Exeter stabling point where they were immediately withdrawn. The milk tanks would have been put on the 6A21 St. Erth-Kensington later that evening hauled by a Class 52 !!”

    Many thanks to Barry for sharing his photos and his memories with us all.

    North British Type 2 Class 22 D6336 was pictured on Wednesday 22nd September 1971 while shunting 6-wheeled milk tank wagons at Hemyock, the terminus of the 7.5 mile (12 km) Culm Valley branch line that joined the main Bristol to Exeter line at Tiverton Junction. Photo by Barry Gay © CC BY-NC 3.0

     

     

    DEPG NEWS: last week’s roundup included a brief summary of the proceedings of the ANNUAL GENERAL MEETING (AGM) of the DEPG that took place at Williton on Saturday 7th September. A detailed report is being prepared and will be included in the next Newsletter. Any DEPG members who would like to receive the detailed report sooner or by email are invited to request a report by using our CONTACT FORM or emailing the subject ‘AGM REPORT‘ to contact@deg.org

    The Financial Report for 2023 has now been filed with Companies House and the filing with the Charity Commission will be completed later this month (this must be done before 31st October). 

     

    The DEPG is a charity and is run entirely by volunteers, many of whom give both their time and their money to the continuance of work on the locos in the DEPG fleet. If you have been enjoying the roundup for free, have you considered joining us for just £1 a month ? You can then add your name to all of those helping out on the above projects and play your part in the future of our locos for a lot less than the price of a cup of coffee!

     

    JOIN US using whichever membership class is appropriate for your situation and means. CLICK HERE or on the image below or use the QR code to get the details.

         

     

    If you would like to go one step further and come along to help with the work on the locos in our fleet, then please use our CONTACT FORM to let us know that you would like to volunteer and we will respond with more details.

    We look forward to hearing from you !

     

    Go to the previous Weekly Roundup post

  • DIESELGEN – 21/22-Sep-24

    With D9526 as the motive power for a positioning move from Williton to Minehead in preparation for the gala, Class 33 ‘Crompton’ D6575 (33057) and Class 46 ‘Peak’ D182 (46045) were whisked away from a standing start in an impressive demonstration of diesel-hydraulic tractive effort! Pictured at Williton on Wednesday 5th June 2024 by Natalie Royal © CC BY-NC 3.0

     

     

    On Saturday 21st September 2024, Class 35 ‘Hymek’ D7017 will run from Williton to Minehead in readiness for her booked duties on the 10:00 diesel diagram (80 miles per day, Saturday and Sunday under the BLUE timetable).

    Hitching a ride behind will be Class 14 ‘Teddy Bear’ D9526 and Class 33 D6566 (33048), each on the move for different reasons:

    • D9526 will undergo an underframe exam over the pit at Minehead, returning to Williton later in the day.
    • D6566 (33048) is fresh from an ‘A’ exam at Williton and will take over the role of Duty Loco at Minehead from D6575 (33057) who will then be returned to Williton behind D9526.

     

    The booked timings for these moves are as follows:

         0900 depart Williton (WN) to Minehead (MD) arrive 0935 (D7017 leading D9526 and D6566)
         1525 depart MD for WN arrive 1610 (D9526 leading D6575)

    NOTE: Timings may change and the working may be altered or cancelled. The return to WN may take place earlier if the work is completed and a path is available.

     

     

    ALSO IN USE THIS COMING WEEKEND 21/22-Sep is Class 35 ‘Hymek’ D7017 on the 10:00 departure from Minehead and the associated 80-mile diagram both days.

    The booked timings for these workings under the BLUE timetable are:

         1000 depart Minehead (MD) arriving Bishops Lydeard (BL) at 1125
         1230 depart BL arriving MD at 1350
         1430 depart MD arriving BL at 1550
         1635 depart BL arriving MD at 1800

     

    Class 33 D6566 (33048) is booked to haul the last of this season’s BLUE timetable diesel services on 28th and 29th September (timings as above).

     

    Our DIESEL RUNNING DATES page is regularly updated and carries the list of diesel-hauled public services for 2024. This page is used in conjunction with DIESELGEN to provide a complete picture of diesel locomotive activities on the WSR:

    The webcams provide a very good way of watching the action from afar. Click this link: http://www.wsr.org.uk/cams.htm or click on the image below to go to the webcams via wsr.org.uk:

    Webcams are available at Bishops Lydeard, Crowcombe Heathfield, Williton, Watchet (x2), Blue Anchor, Minehead Seaward Way and Minehead Station. Select the appropriate webcam by clicking on the blue button on the webcam page. Many thanks to Railcam UK and the WSR for providing these webcam services.

     

    Have you considered joining the WEEKLY ROUNDUP e-newsletter list? Click here for details.

    VOLUNTEERING OPPORTUNITIES: We are looking for additional engineering help to maintain our fleet of elderly locomotives, so if you have such skills and would like to join the DEPG and come along to Williton for a ‘taster day’, then please use our CONTACT FORM so that we can get in touch with you.

    Social media channels:


     

Posts navigation